Recorded, of 74 rooms originally intended for the victims of the ambrolnya Situ Gintung Dyke, until now the new 20 rusunawa filled the room. In fact, this was completed in rusunawa 2010.
"Since it started operating, the majority have not been filled," said Yayah, rusunawa management registration section, Monday (4/3/2013) yesterday.
To achieve it must be via the rusunawa berkonblok 2.5 metres wide along one kilometre of Highway Serua. The perimeter of the flats which are in the midst of that villages are still filled with 1-meter-tall shrubs.
Based on the radar of the four floors of the building, the bottom two floors are well preserved, while the look three and four floors look less neglected. A four-floor rooms also look broken. The rooms were filthy floors full of dust.
"It's four floors are still in preparation, is also being carried out repairs which have been damaged," said Yayah.
Prints, one of the guards at rusunawa, admit, that it's less well-preserved rusunawa, especially on the floor that has not been settled.
"The roof is leaking, too," he said. (RAY)

Rating: 100% based on 99998 ratings. 5 user reviews.
Author: Unknown
Thank you for your coming, please leave your comment
Tidak ada komentar:
Posting Komentar